Covalent Lithium Refinery Project

MARKET MINING  |  SECTOR BATTERY METALS
Origin(s)

Kwinana, Western Australia

Destination(s)

Kwinana Western Australia

Project

Covalent Lithium Refinery Project

Equipment

59 x Oversize Process Tanks

Total Volume

35,000 cbm

Total Weight

1,100 mt

Heaviest Lift

25 mt

Year

2023

PROJECT OVERVIEW

Westlink managed the turnkey end-to-end logistics of fifty-nine (59) oversize process tanks from a local fabrication yard to the Covalent Lithium Refinery project site in Kwinana.

SCOPE

  • Pre-shipment inspections at fabrication yard

  • Craneage – loading trailers with tanks at fabrication yard

  • Oversized Haulage – fabrication yard to Kwinana project site

  • Oversized Traffic Management – escorts, wardens and overhead powerline management

  • Construction Coordination – coordination with site team to unload trailers into laydown or direct installation

HIGHLIGHTS

  • Zero LTIs

  • No missed warden / escort dates

  • Laydown management with delivery coordination to site according to construction schedule

  • Various bespoke trailer layout and lashing designs due to individual design of each tank

  • Safe and seamless traffic management through busy built up industrial / urban area of Kwinana