We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
PROJECT HIGHLIGHT
ONEPACE
PROJECTS
SAPN Kangaroo Island Power Cable Project
MARKET INFRASTRUCTURE SECTOR POWER
Origin(s)
ZTT Nantong, Nantong, China
Destination(s)
Adelaide, Australia
Project
SAPN Kangaroo Island Power Cable Project
Equipment
1 x Power Cable Basket and accessories
Total Volume
1,120 cbm
Total Weight
836 mt
Heaviest Lift
750 mt
Year
2018
PROJECT OVERVIEW
Westlink was engaged by a customer to provide a multimodal logistics solution for a 750 metric ton power cable basket fabricated and spooled in Nantong, China to be used in the construction of a new power cable from Kangaroo Island to Adelaide in South Australia.
SCOPE
-
Crane barge – lifting of empty cable basket onto self-propelled barge
-
Self-propelled barge – spooling of power cable into empty basket at ZTT Nantong
-
Self-propelled barge – transfer of full cable basket from ZTT Nantong to Long Wu Terminal, Shanghai
-
Heavy Lift Vessel (HLV) – lift and load full power cable basket from self-propelled barge
-
Heavy Lift Vessel (HLV) – Shanghai, China to Adelaide, Australia to meet construction vessel to discharge power cable basket and accessories
HIGHLIGHTS
-
Zero LTIs
-
Heavy lift of 750 metric ton
-
Spooling of fifteen (15) kilometres of power cable onto empty cable basket onto self-propelled barge
-
Vessel to vessel transfer – lift of full cable basket from self propelled barge to HLV
-
Vessel to vessel transfer – direct delivery of laden cable basket from HLV to construction vessel
-
On time delivery met tight construction window dictated by seasonal harsh weather conditions
-
The longest continuous undersea cable to be installed in Australia