We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
PROJECT HIGHLIGHT
ONEPACE
PROJECTS
NCIG Coal Export Terminal Stage 2AA Project
MARKET MINING | SECTOR COAL
Origin(s)
Bangpakong, Thailand
Destination(s)
NCIG Coal Export Terminal, Kooragang Island, Australia
Project
NCIG Coal Export Terminal Stage 2AA Project
Equipment
Structural Steel, Trusses, Chutes
and Bins
Total Volume
35,000 cbm
Total Weight
5,000 mt
Heaviest Lift
190 mt
Year
2011
PROJECT OVERVIEW
Westlink was engaged to provide a multimodal logistics solution for structural steel, trusses, chutes and bins from Bangpakong, Thailand to constructions of new conveyors, transfer house, sample station, buffer bin and dump station for Newcastle Coal Infrastructure Group (NCIG) export coal terminal on Kooragang Island, Newcastle, Australia.
SCOPE
-
Pre-shipment inspections at fabrication yard in Bangpakong, Thailand
-
Oversized Haulage – from fabrication yard to vessel hook at Laem Chabang, Thailand
-
Multipurpose Vessel (MPP) – Laem Chabang, Thailand to Newcastle, Australia
-
Oversized Haulage – vessel hook or NCIG Stage 2AA project site
-
Construction coordination – coordination with site team to unload trailers into laydown
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
35,000 cubic metres (cbm) of steel with heaviest lift 190 metric tons
-
5 consecutive breakbulk and heavy lift shipments
-
Transport of oversized pieces through built up Newcastle area
-
Management of staging yard to effectively coordinate deliveries to project site
-
Delivery to installation points and laydown at NCIG project site