We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Origin APLNG Project
MARKET ENERGY | SECTOR LNG
Origin(s)
Kuantan, Malaysia
Destination(s)
Origin APLNG Project Site, Gladstone, Australia
Project
Origin APLNG Project
Equipment
Concrete and FBE Coated
Line Pipe
Total Volume
365,000 cbm
Total Weight
180,000 mt
Longest Pipe
42 inch and 18 m long
Year
2012
PROJECT OVERVIEW
SHARE
Westlink was engaged to provide a multimodal logistics solution for 520 kilometres of large diameter concrete and FBE coated line pipe from a coating facility in Kuantan to Gladstone Port for Origin’s APLNG Project. The delivered pipe was used in for the construction of a high-pressure gas transmission line for the project to connect gas fields in the Surat and Bowen Basins to the newly constructed LNG plant on Curtis Island in Australia.
SCOPE
-
Pre-shipment quarantine inspection at WASCO coating yard in Kuantan, Malaysia
-
Holiday testing and cleaning of line pipe at coating yard prior to loading on vessel
-
Multipurpose Vessel (MPP) – Kuantan, Malaysia to Gladstone, Australia
-
Haulage – delivery and marshalling within Gladstone Port limits at laydown yard
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
365,000 cubic metres (cbm) of pipe delivered
-
Specialised vessel selection used for 11 consecutive monthly breakbulk shipments
-
Large 42 inch (in) diameter pipe
-