We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Silicone Production Plant Upgrade
MARKET INDUSTRIAL | SECTOR CHEMICAL
Origin(s)
Batam, Indonesia
Destination(s)
ASM Plant, Rayong, Thailand
Project
Silicone Production Plant Upgrade
Equipment
Weak Acid Reactor with sensitive brick lining
Total Volume
288 cbm
Total Weight
275 mt
Heaviest Lift
275 mt
Year
2019
PROJECT OVERVIEW
Westlink was engaged to provide a multimodal logistics solution for a heavy weak acid reactor vessel that contained sensitive brick lining. The vessel was to be installed at silicone production plant upgrade in Rayong, Thailand and required transport from the fabrication yard in Batam, Indonesia.
SCOPE
-
Spacer barge – to provide sufficient draft for Heavy Lift Vessel at Batam fabrication yard
-
Heavy Lift Vessel (HLV) – Batam fabrication yard wharf to Port of Map Ta Phut
-
Heavy Haulage – Port of Map Ta Phut to ASM Plant in Rayong
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
Heavy lift and haulage for 275 metric ton (mt)
-
Oversize transport envelope – 18 x 4 x 4 metres
-
HLV and barge interfacing
-
Heavy haulage through built up Rayong industrial area from port to delivery point
-
Direct install from heavy haulage delivery point
-
No disruption to silicone production