PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Grosvenor Coal Preparation Plant Extension Project
MARKET MINING | SECTOR COAL
Origin(s)
Tianjin, China
Destination(s)
Anglo American Grosvenor project site, Australia
Project
Grosvenor Coal Preparation Plant Extension Project
Equipment
Conveyor System and
Processing Plant
Total Volume
20,000 cbm
Total Weight
2,400 mt
Heaviest Lift
40 mt
Year
2014
PROJECT OVERVIEW
Westlink was engaged to provide a multimodal logistics solution for stick steel, modules and other fabrications for conveyor systems and processing plant fabricated in Tianjin, China to be used in the construction of a coal preparation plant extension project at Anglo American’s Grosvenor operation southwest of Mackay, Australia.
SCOPE
-
Multipurpose Vessel (MPP) – Lingang, Tianjin to Mackay
-
Oversize Haulage – Port of Mackay to Grosvenor project site
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
20,000 revenue tonne with heaviest lift 40 metric ton
-
Full and complete ship charter with maximised stow to reduce ocean freight cost
-
Transport of modules and fabrications to project site nearly 200 km from Mackay