top of page
PROJECTS

Woodside XENA Project

Westlink Logistics Flowline Reel
MARKET ENERGY  |  SECTOR LNG
Origin(s)

Kalundborg, Denmark

Destination(s)

Woodside Burrup Material Facility, Australia

Project

Woodside XENA Project

 

Equipment

1 x Flexible Flowline Reel

Ancillary Equipment

Total Volume

1,000 cbm

Total Weight

150 mt

Year

2014

Heaviest Lift

85 mt

PROJECT OVERVIEW

Westlink provided an end-to-end logistics solution - from factory to field - with vessel loading operations at the NOV’s private berth in Kalundborg, Denmark, and timely delivery of the reel and ancillary equipment to Woodside’s Burrup Material Facility (BMF) in Dampier, Australia.

SCOPE

  • Pre-shipment quarantine and factory completion inspection of reel and equipment in Kalundborg

  • Heavy Lift Vessel (HLV) – Kalundborg, Australia to Woodside BMF, Australia

Mining Specific Logistics

HIGHLIGHTS

  • Zero Lost Time Injuries (LTI’s) 

  • Third party Marine Warranty Surveyor compliance

  • Successful loading and discharge at NOV and Woodside private berths respectively

  • Australian Invasive Marine Species (IMS) compliance associated with private berth

  • Delivered twenty (20) days ahead of schedule

GALLERY

bottom of page